PL EN
THE DEVELOPMENT OF WATER AND SEWAGE INFRASTRUCTURE IN THE SUBREGION OF WESTERN MALOPOLSKA IN YEARS 2003-2013
 
Więcej
Ukryj
1
Cracow University of Economics, ul. Rakowicka 27, 31-510 Kraków, Poland
 
 
Data publikacji: 01-01-2017
 
 
Autor do korespondencji
Agnieszka Petryk   

Katedra Gospodarki Regionalnej, Wydział Gospodarki i Administracji Publicznej, Cracow University of Economics, ul. Rakowicka 27, 31-510 Krakow, Poland
 
 
J. Ecol. Eng. 2017; 18(1):176-182
 
SŁOWA KLUCZOWE
DZIEDZINY
 
STRESZCZENIE
Saturation and dynamics of the change of water and sewage infrastructure in the subregion of Western Malopolska in the years 2003-2013 have been determined. It covers the area of four counties located farthest west and north of the Malopolskie Voivodeship that is Chrzanów county, Olkusz county, Oświęcim county and Wadowice county. In order to illustrate the condition of water-sewage economy of the subregion, the number of connections, the number of users and the length of collective sewerage system and the length of distributive water supply system have been evaluated.
Journals System - logo
Scroll to top